Conditional Probabilityhard
0:00.0

A manufacturing plant has three shifts. Shift A (40% of production) has a 2% defect rate. Shift B (35% of production) has a 3% defect rate. Shift C (25% of production) has a 4% defect rate. If an item is selected and found to be defective, what is the probability it was NOT produced by Shift B?